Skip to content

Solar Energy Specialists · Abuja, Nigeria

Stop renting power. Own your energy.

Solar and battery systems designed, installed and maintained across Nigeria.

01As it stands

Grid power when it comes, generator when it does not.

1,000+ SYSTEMS INSTALLED20 STATES24/7 SUPPORT

The energy meter

How much is NEPA taking from you?

Count what you run, set the hours you get, and the meter works out your units and your bill. Then watch for the month a solar system overtakes it.

What you run

Rooms

lighting and sockets follow this

5

Air conditioner, 1 HP

750 W

0

Air conditioner, 1.5 HP

1,100 W

2

Air conditioner, 2 HP

1,500 W

0

Chest freezer

200 W, cycles on and off

1

Fridge

150 W, cycles on and off

1

Television

100 W

2

Ceiling or standing fan

75 W

4

Pumping machine

750 W, short runs

0

Electric iron

1,000 W, short runs

0

Microwave

1,200 W, short runs

0

Water heater

1,500 W

0
1h24h

12 hours is the usual six to six. Everything runs for its own normal hours, capped by whatever supply you actually get.

per unit

Band A runs around ₦209 as of August 2026 and some DisCos bill more. Put in what your meter charges. Anything from 50 to 2,000 is accepted.

Units used

770

per month, 25.7 a day

Electricity bill

₦169,488

per month at ₦220 a unit

Solar system

₦7,550,000

once, then upkeep

2.8 kW at once, 25.7 units a day

Suggested size

Large home, shop, clinic or small office. A 10 kVA inverter with a 16 kWh lithium bank, good for about 26 units a day.

₦0₦5.4M₦10.8M₦16.2M₦21.6Mnow2yr4yr6yr8yr10yrBillsSolar
Both lines show money spent since day one. The bills keep climbing; the solar system stops.

Month 48. You stop paying.

After that the system has paid for itself. Over ten years you keep ₦11,348,560 that would otherwise have gone to the meter.

Send these figures to us

ASSUMPTIONS · ₦220 per unit · 5 rooms at 30 W and 20 W each · fridges and freezers cycle rather than run flat out · system ₦7,550,000 · solar upkeep ₦12,000/mo · 30 days/month · figures August 2026

Indicative estimates, not a quote. Real numbers come from an energy audit, because panel count, roof aspect and your actual load all move them.

1,000+
Systems installed
5+
Years in Nigeria
24/7
Technical support
20
States covered

How it goes

Our process in six steps.

The full process
  1. 01

    Energy audit

    We come and count what you use.

  2. 02

    System design

    Sized from your numbers.

  3. 03

    Supply

    Equipment on site.

  4. 04

    Installation

    One to two days.

  5. 05

    Commissioning

    Tested, then handed over.

  6. 06

    Monitoring and maintenance

    It stays our problem.

Where we work

20 states, and counting.

Our crews are based in Abuja and they travel. These are the states we work in most. If yours is not listed, ask. We will quote the travel and let you decide.

  • Abuja (FCT)
  • Lagos State
  • Kano State
  • Rivers State
  • Ogun State
  • Kaduna State
  • Plateau State
  • Delta State

Start with an energy audit.

We come out, measure every load, and tell you what it would take. If solar is not the right answer for your building, we will say so.

PLOT 706 CASSAVA STREET
WUYE, ABUJA, NIGERIA